NOTICE
TOWNSHIP OF MONTVILLE
2017 ROAD RESURFACING PROGRAM
PLEASE BE ADVISED THAT ON OR ABOUT MONDAY, AUGUST 31st, MILLING AND PAVING WILL BEGIN BY THE TOWNSHIP’S CONTRACTOR, TILCON NEW YORK, ON THE ROADS LISTED BELOW.
WE ASK THAT YOU LIMIT TRAVEL, IF POSSIBLE, DURING THE WORK HOURS OF 8:30 A.M. TO 4:30 P.M.
IF YOU HAVE ANY QUESTIONS OR CONCERNS, PLEASE CALL THE ENGINEERING DEPARTMENT AT 973-331-3323.
THANK YOU FOR YOUR PATIENCE & COOPERATION.
______________________________________
NICK MARUCCI, PE-PLS
TOWNSHIP ENGINEER & LAND SURVEYOR
ROAD
Passaic Valley Road (From #75 to Horseneck Road)
Robin Court (Entire Length)
Konner Avenue North (From Horseneck Road to #175)
Brittany Road (Entire Length)
Alsace Place (Entire Length)
Calais Place (Entire Length)
Eckhardt Circle (Meadows to Changebridge Road)
Cambray Road (Entire Length)
Mall Way (Entire Length)
Windsor Drive (From #30 to #76)
Rutledge Road (Entire Length)
Woodmont Road (From Konner Ave. to Woodmont School)
Pine BrookRoad (From WhitehallRoad/202 to Longview Drive)
Century Court (Entire Length)
Village Drive (From Macculoch Driveto Kayhart)
Midland Road (Entire Length)
Vista Road (From Valhalla Drive to Lake ShoreDrive)
Hathaway Road (Entire Length)
Fox Road (Entire Length)
Diann Drive (Entire Length)
Edwards Circle (Entire Length)
David Alan Way (Entire Length)